July 2006
In July 2006Ç. Manufacturing and delivery of the equipment for installation catalytic cracking 43-107 Pavlodar oil refining factories.
More in detail
15.04.06
In March-April 2006Ç. Forces of the "Aliter-Aksi" company as general contractor, reconstruction of furnace P-2 of installation 37-40 Company "Lukoil-Permnefteorgsintez" is executed.
More in detail
|
Articles
- Zhidkov A.B. Designing, manufacturing, installation, prospects of development of furnaces of the enterprises of oil refining branch. Materials of branch meeting of the main mechanics of the oil refining both petrochemical enterprises of Russia and the CIS., TCNIIT Eneftekcim, p.177-185.
- Zhidkov A.B., Vanslov A.V. Problem and prospects of development of tubular furnaces for a petroleum-refining industry. Chemical and oil-and-gas mechanical engineering 12, 2001, p.13-15.
- Zhidkov A.B., Vanslov A.V., Egorenko B.M. Action on safe work of tubular heating furnaces on îðú. Safety of work in the industry, 4, 2002, p.35-39.
- Zhidkov A.B., Vlasov V.V., Denisov D.E. Experience of manufacturing and operation abrasion-resistant elements of installations catalytic cracking. Chemical technics, 12, 2002, p.24-28.
- Denisov D.E., Zhidkov A.B., Kahmurov A.V. Application of fire-resistant concrete for manufacturing and repair liners cars of tunnel furnaces of brick-works. Building materials, 4, 2003, p.18-20.
- Denisov D.E., Zhidkov A.B., Vlasov V.V. Fire-resistant (heat resisting) concrete of the enterprises of oil refining and petrochemistry. KHTTM, 4, 2004, p.21-25.
- Zhidkov A.B. Designing, manufacturing, construction of furnaces of the petrochemical industry. Chemical technics, 4, 2004, p.29-32.
- Zhidkov A.B., etc. Inspection of the oven block of Open Company " Lukoil- Permnefteorgsintez ", èôôí, 3, 2004, p.22-26.
- Zhidkov A.B., etc. Park of multichamber furnaces reforming. Prospects of major overhaul and reconstruction, èôôí, 4, 2005, p.19-23.
- Zhidkov A.B. Bak for burning emergency dumps. Experience of construction and operation, èôôí, 3, 2005, p.27-28.
- Zhidkov A.B., Denisov D.E., Garabadzhiu A.A. Fire-resistant materials and products for furnaces of thermal units of the enterprises of the industry of mineral fertilizers, îôî, the Russian Union of Chemists, 10-11, 2005, p.90-94.
-
Denisov D.E., Zhidkov A.B. Furnaces with liner from fire-resistant concrete, KHGM, 5, 2006, p.17-20.
- Zhidkov A.B., Denisov D.E.
Prospects of reconstruction and major overhaul of high-temperature furnaces of the enterprises of petrochemistry. Chemical technics, 3, 2006, p.10-12.
-
Denisov D.E., Zhidkov A.B.
Protection of thermal units of installations of gas purification by fire-resistant concrete. The report at conference "Gas purifying-2006." (format PDF, 510 ëb)
-
Denisov D.E., Zhidkov A.B., Vlasov V.V.
ábrasion-resistant lineres catalytic cracking. The report at branch meeting on catalytic cracking. Yaroslavl. On June, 7-8th, 2005 (format PDF, 550 ëb)
-
Denisov D.E., Maksimov M.V.
Concrete with the lowered maintenance of cement for smelting -foundry units of aluminium manufacture. "Nonferrous metals", 2004, N2 (format PDF, 150ëb)
-
Huhrin E.A., Rizvanov I.V., Zaporin V.P., Valjavin G.G., Ahmetov A.F.
Experience of use of the rests oxyhydroxide coals in manufacture electrode coke (format PDF, 210ëb)
-
Huhrin E.A., Valjavin G.G., Valjavin K.G.
Place of process of the slowed down coking in plans modern NPZ (format PDF, 210ëÂ)
|