July 2006
In July 2006Ç. Manufacturing and delivery of the equipment for installation catalytic cracking 43-107 Pavlodar oil refining factories.
More in detail
15.04.06
In March-April 2006Ç. Forces of the "Aliter-Aksi" company as general contractor, reconstruction of furnace P-2 of installation 37-40 Company "Lukoil-Permnefteorgsintez" is executed.
More in detail
|
Performed works:
The enterprises oil refining and petrochemistry
Installations catalytic reforming
Place of arrangements |
Date of reconstruction |
Type of installations |
Improvement furnace |
Power of installations, thousand tons/years |
Ryazan, Russia |
1994 |
LG-35-11/600
L 35-11/300 |
P-1
Cylindrical
P-201
P-1 |
600
300 |
Kherson *, Ukraine |
1992-1994 |
LCH 35-11/600 |
P-601 |
600 |
Kremenchug, Ukraine |
1997 |
LCH 35-11/600 |
P-1 |
600 |
Kirishi, Russia |
1993
1997
1999 |
L 35-11/300
L 35-11/600
LCH-35-11/1000 |
P-1
P-1
P-1 |
300
600
1000 |
Saratov, Russia |
1993-1995
1997 |
LCH 35-11/600
L 35-11/300 |
Arch of furnace P-1
P-1 |
600
300 |
Volgograd, Russia |
1994
1995 |
L 35-11/300
L 35-11/300B |
P-1
P-1 |
300
300 |
Turkmenbashi, Turkmenia |
1996 |
L 35-11/300 |
P-1 |
300 |
Tuapse, Russia |
1993-1994 |
L 35-11/300 |
P-1 |
300 |
Ukhta, Russia |
1996-1997 |
LG 35-11/300 |
Arch of furnace P-1 |
300 |
Kstovo, Russia |
1996 |
LCH 35-11/600
LCH 35-11/300 |
P-1
P-1 |
>600
300 |
Khabarovsk, Russia |
1998 |
LG 35-11/300 |
P-1 |
300 |
Novokuybyshevsk, Russia |
1998 |
L 35-11/300 |
Cylindrical furnace hydroclearing, delivery with a coil |
300 |
Purpe*, Russia |
2000 |
LCH 35-11/40 |
The oven block |
40 |
Omsk, Russia |
2000-2001 |
L-35/11-600 |
P-1, P-201 |
600 |
Novopolotsk |
2001 |
L-35/6 |
"ôatorei" |
|
Novokuybyshevsk, Russia |
2001 |
L-35/6 |
P-1 |
300 |
* New construction
Liner reactors of installations catalytic reforming and hydroclearing
Place of arrangements |
Date of reconstruction |
Type of installations |
Type of reactor |
Ryazan, Russia |
1995 |
LG 24/7 |
Hydroclearing |
Saratov, Russia |
1997 |
L 35-11/300 |
reforming |
Novopolotsk, Belarus |
1997 |
benzol |
ò-901 |
Tuapse, Russia |
1996 |
L 35-11/300 |
reforming |
Kirishi, Russia |
1997-1998 |
L 35-11/600 |
ò-1, ò-4/1, ò-4/2 |
Novopolotsk, Russia |
1999 |
L 35-11/600 |
reforming |
Installations of division of aromatic hydrocarbons
Place of arrangements |
Date of reconstruction |
Type of installations |
Type of furnace |
Kirishi, Russia |
1995 |
Allocation total xylenes |
Cylindrical P-7,
shotcreting flue |
Ufa, Russia |
1995 |
Manufacture flavouring |
Cylindrical BN-811ëPá |
Novopolotsk, Belarus |
1998 |
Manufacture paraxilol |
Cylindrical P-400/101
P-400/103 |
Installations of primary destillery of oil
Place of arrangements |
Date of reconstruction |
Type of installations |
Type of furnace |
Tuapse, Russia |
1994
1995 |
AT-1
AT-2 |
Cylindrical
Cylindrical |
Ukhta, Russia |
1999
2000 |
AT-1
AT-1 |
Horizontal
Vertical rectangular |
Ryazan, Russia |
2000 |
Bitumen |
Horizontal |
Installations catalytic cracking and hydrocracking
Place of arrangements |
Date of reconstruction |
Type of installations |
Type of furnace |
Angarsk, Russia |
1993
1995
1999 |
1á-1M
GK-3
GK-3 |
Transport lines of the catalyst
Remote cyclones
Liner cyclones and
transport lines |
Ryazan, Russia |
1991
1991
1993
1999 |
1á-1M |
Transport lines of the catalyst,
liner a regenerator |
Turkmenbashi, Turkmenia |
1994
1996
1999 |
1á-1M |
Transport lines of the catalyst,
catalyzatoroprovod, cyclonic
gGroup of a regenerator |
Ufa, Russia |
1987
1997 |
1á-1M |
Transport lines of the catalyst
Liner a reactor of a regenerator |
Kremenchug, Russia |
1998 |
GK-3 |
Liner a regenerator |
Ryazan, Russia |
2001 |
1á-1M |
Liner transport
lines of hot air |
Back
|