NEWSJuly 2006In July 2006Ç. Manufacturing and delivery of the equipment for installation catalytic cracking 43-107 Pavlodar oil refining factories.
|
|
|
In March-April 2006Ç. Forces of The "Aliter-Aksi" company as general contractor, reconstruction of furnace P-2 of installation 37-40 Companies "Lukoil-Permnefteorgsintez" is executed.
The purpose of work was modernizations of the chamber convection furnaces which before reconstruction practically did not bring the component in thermal balance of the furnace.
During technological calculations and designing full replacement of a design of the chamber convection furnaces and partial - chambers of radiation is made. As a result of reconstruction, the contribution convective making heating efficiency furnaces has increased about 6 % up to 21 %, before reconstruction accordingly, and the EFFICIENCY has increased for 12 %. Thus dimensions of the furnace have remained former, marks and geometry of a flue have not changed.
The furnace is put into operation in May, 2006. The furnace has left on a mode, all design parameters are achieved, Remarks from the Customer are not present.
The furnace before reconstruction and after.

| Company " Aliter-Aksi" |