OOO Aliter-Aksi.


NEWS

July 2006

In July 2006Ç. Manufacturing and delivery of the equipment for installation catalytic cracking 43-107 Pavlodar oil refining factories.
More in detail


15.04.06

In March-April 2006Ç. Forces of the "Aliter-Aksi" company as general contractor, reconstruction of furnace P-2 of installation 37-40 Company "Lukoil-Permnefteorgsintez" is executed.
More in detail

 

HotLog

News

November, 21st, 2002

During since July 2002 till October 2002 reconstruction of installation dewaxing 39/8 Open Societies "Novokyibishevski a factory of oils and additives" companies "Yukos" Novokuybyshevsk the Samara area was spent.

Forces "áliter-Aksi" under project VNIINEFTEMASH had been produced furnaces P-1 and P-2: lined metallic structurewith a chimney, ladders and platforms. Furnaces P-1 and P-2 cylindrical with ring chambers convection. The furnace P-1 has internal diameter of 3600 mm (on metal), the furnace P-2 has internal diameter of 2800 mm (on metal).

Radiant the part of furnace P-2 has been put on assembly site entirely (the uniform block). By development of working drawings the plan of assembly of the chamber of radiation of furnace P-1 has been changed: instead of six segments (three on diameter and two height of the chamber of radiation) it is made ten poluobechaek (two diameter and five on height) with bolted connection. These engineering decisions have enabled to accelerate and simplify installation of the oven block which has been lead within one month.

For today the oven block of installation 39/8 is removed on an operating conditions.


The oven block of installation 39/8. The furnace P-2.


The oven block of installation 39/8.
The chief installation of furnaces by the senior engineer "áliter-Aksi" P.V.Kozlov